About The Project

General Contractor: Schmeeckle Brothers Construction

Location: Jerome, iD

This large-scale processing and packing plant, is over 400,000 sq feet. The project had over 21000 amps of power installed in 7-3000amp services. The facility has 18 different motor control centers throughout the Main and adjoined buildings. Specialized cable used throughout to minimize harmonics.